Tanzanian Delegation Visits CDS Solar to Discuss 150MW Solar Power Project with Trackers

Executive Summary

A high-level delegation of experts from Tanzania’s power utility and leading developers recently visited CDS Solar to explore cooperation on a 150MW solar power project with single-axis trackers. The visit centered on technical discussions, project structuring, and strengthening ties for the development of a landmark renewable energy initiative in Tanzania.

oplus_141557762

Purpose of the Visit

The visit was designed to:

  • Review CDS Solar’s EPC expertise and track record.
  • Discuss the two-phase project rollout:
    • Phase 1: 50MW PV + 10MWh Battery Energy Storage + Trackers
    • Phase 2: 100MW PV + Trackers
  • Align on technical specifications, construction schedules, and financing models.

Key Highlights of the Meeting

1. Project Walkthrough

CDS Solar presented detailed plans for Phase 1, emphasizing how the 10MWh battery will stabilize grid performance, smooth ramp rates, and support evening demand peaks. For Phase 2, the focus will be scaling up efficiently using proven Phase 1 data.

2. Technology Demonstration

Delegates reviewed single-axis trackers, visited manufacturing facilities, and inspected quality control processes. This hands-on experience gave confidence in the performance, durability, and monitoring systems behind the project.

3. Knowledge Sharing

CDS Solar provided insights into O&M training, safety culture, and grid integration, ensuring Tanzania’s local teams will gain the skills needed for long-term operations.

_cuva

Impact for Tanzania

The project will help diversify Tanzania’s energy mix, provide clean and reliable power, and create jobs through local construction, supply chains, and long-term operations. The visit strengthened trust and marked an important milestone toward realizing a 150MW solar project that combines scale, stability, and innovation.

Conclusion

The Tanzanian delegation’s visit to CDS Solar laid the foundation for a strong partnership. With clear alignment on technology, project phases, and financing models, both sides are now better positioned to move forward quickly. This collaboration represents a major step in advancing Tanzania’s renewable energy future.

_cuva
Facebook
Twitter
LinkedIn

Leave a Reply

Your email address will not be published. Required fields are marked *

Send us a Message

Social Media

On Key

Related Posts

Ask For A Quick Quote

We will contact you within 1 working day, please pay attention to the email with the suffix “@cds-solar.com”

We don’t have any staffing needs at the moment, so please don’t fill out the form if you’re looking for a job! ! !

Ask For A Quick Quote

We will contact you within 1 working day, please pay attention to the email with the suffix “@cds-solar.com”